Fax Fax: +44 (0) 1626 244 266 Phone Tel: +44 (0) 1626 834397 Email Email: office@arenatiling.co.uk
Member of The Tile Association
CITB Construction Skills
Investor In People

Honda F1 Training Academy

Arena Tiling were employeed by our reputation for quality of works we offer within the motor industry to complete the wall and floor tiling to a newly built state of the art training facility at Honda Formula One Headquarters in Brackley. The tiling works to the driver changing and shower rooms and communal areas. The floor tiles had to be to an R11 rating and we provided the client with a specification to suit the project requirements and to continue a Honda corporate theme throughout the walls. Arena specified a Nicobond Margres floor tile cut to falls in each individual shower with the same floor tile and skirt being used throughout the changing areas.

Honda F1 are fully aware that they work to an extremely high standard were millimeter perfect enginerring requirements are the norm. Arena Tiling were contracted to do this contract based on our high quality reputation within the motor sector and it was clear from the start that millimetre prefect tiling would also be the norm. The project was completed on time with the desired standards required by Honda.


Please click on an image to enlarge it.